There is no published MOQ for container houses from China, and that is a signal rather than a gap. What minimum order quantity actually turns on, how one 40HQ holds an order, and the six questions that decide it.
Read the guide
Detachable and flat-pack describe two different decisions: how a unit is fastened and how it ships. Side-by-side specs, the five questions that decide it, and what we quote per project.
Read the guide
There is no list price for a flat-pack container house. The five factors that move the number, the specification to quote against, and the costs that sit outside the unit price.
Read the guide
Linear plank, baffle and open-cell ceilings look similar in photos but they answer different briefs. The decision tree, profile tables and price drivers specifiers need before the drawing goes to quotation.
Read the guide
Which certificates a modular building or aluminium ceiling project needs is decided by the destination market, the procurement route and the acceptance inspection. The six document categories buyers ask for, what each one proves, and which stage it blocks.
Read the guide
How to check a Chinese prefab supplier before paying a deposit: the public business register, the factory behind the quotation, certificate numbers at the issuer, the payment route and the proforma invoice specification.
Read the guide