Guides / Sourcing
A modular home factory in China sells a package of steel frame, panels, doors, windows and fittings, cut to a drawing and loaded into containers. It does not sell a finished house that arrives ready to occupy. Three things decide whether the order works: the drawing the factory builds to, the container plan that sets the freight, and the documents that travel with the load. This page is about those three, in the order they cost money.
The product is a drawing plus a packing list, and the house is what the two of them become on site. A Chinese manufacturer sells the structure and the envelope as a kit: galvanized light-gauge steel frame, wall and roof panels with insulation, doors and windows, and the electrical and plumbing rough-in. Foundations, crane, on-site labour and local code compliance normally sit outside the factory price.
That is why two quotations for the same floor plan can differ by a third and both be honest. One includes the interior fit-out package and the other does not; one has priced the frame at 1.2 mm and the other at 0.8 mm; one has counted four units per container and the other has counted the panels. The sections below give you the vocabulary to tell those apart before you pay a deposit.
Modular home covers at least four things in this trade, and they are not interchangeable. What ships, how it assembles and what it is good for differ enough that the first question to a supplier is which of these you are asking about.
| Type | What ships | How it assembles | Where it fits |
|---|---|---|---|
| Light-steel frame villa | Galvanized C/Z sections cut to length, wall and roof panels, windows, doors, fittings | Flat-pack: frame bolted up, panels closed, services connected on site | Houses and guesthouses where the plan is bespoke and the site has a crew |
| Flat-pack container house | Pre-cut frame and panels that stack into a container as flat bundles | Bolted on site, usually within days | Repeatable units: site offices, worker accommodation, small clinics |
| Detachable container house | Floor, roof and corner posts as separate frames, wall panels packed between them | Bolted corner posts, panels slid in, roof fixed | Camps and offices that will be relocated more than once |
| Space capsule | A finished shell unit with the interior fitted at the factory | Lifted onto a prepared base, services connected | Hospitality and show units where the interior is the product |
We supply all four, and the honest comparison is not which one is best but which one the site and the budget support. A villa wins on plan freedom and loses on assembly time. A container unit wins on speed and loses on ceiling height and plan flexibility. The light steel villa versus concrete comparison covers the first of those trade-offs in cost and lifespan terms.
The inclusions list is where a cheap quotation is usually made cheap. Below is the split we use, and a supplier whose list looks different should be asked to mark which side of the line each item falls on.
In the factory price
Normally outside it
The wall build-up is the line item most often argued about, because board thickness, insulation type and insulation thickness are chosen for the destination climate and the applicable building code. That build-up is confirmed on the quotation before production rather than assumed at the enquiry stage.
Nothing in a modular order is cut until a drawing is signed, so the quality of that drawing decides the quality of the delivery. A shop drawing set that is worth signing carries seven things: plan and elevations with dimensions; the wall build-up with each layer named; the panel layout with joint positions; a door and window schedule with handing; the electrical and plumbing point layout; the foundation interface with fixing positions; and the lifting points.
Two failures repeat across orders. The first is a drawing signed by someone who assumed a technical drawing would follow for review, when the signature had in fact released the factory to cut. The second is a specification change after sign-off, which is the most common reason a date slips, because components were already cut against the signed version. Both are administrative, and both cost more than the review would have.
The clock on an order starts twice: the deposit books the production slot, and the signed drawing releases the unit into build. Lead time is counted from the later of the two, which is why a supplier quoting one number without saying which event it counts from is not giving you a schedule.
Freight is decided before the first panel is cut, by how the package stacks. The envelope is fixed by ISO 668: a 20 ft container is 6,058 x 2,438 x 2,591 mm externally, a 40 ft is 12,192 x 2,438 x 2,591 mm, and a 40 ft high cube adds height at 2,896 mm. Inside a 40 ft high cube you are working with roughly 12.03 m of length, 2.35 m of width and 2.69 m of height, about 28.3 m2 of floor and 76 m3 of volume.
Those figures explain why the question of how many houses fit in a container cannot be answered from a photograph. Frame sections and panel bundles are long and flat, so the real constraint is how the bundle stacks and whether roof panels can be nested, not the total weight. A 40 ft container has a maximum gross mass of about 30,480 kg and a tare near 3,900 kg, which leaves roughly 26.5 tonnes of payload, and a panel package usually reaches the volume limit long before it reaches that mass.
The loading count therefore belongs in the quotation, per floor plan, next to the freight basis. If two suppliers quote different counts for the same house, one of them is loading the frame outside the container or has measured a different module.
Certification is a word that hides a scope, so ask for the document rather than the claim. Six are worth having in the file before the deposit leaves.
Inspection is the other half of the paperwork. Our process covers drawing and specification freeze, first-piece approval, in-line checks during production, measured pre-shipment inspection on the actual run, and a packing list checked against the cartons that were loaded. The scope is written on the inspection page and can be written into your quotation.
An order is a chain of stages, and each one has a document that closes it. If a stage closes on a phone call rather than a document, that is the stage that will be argued about later.
| Stage | What you provide | What closes it |
|---|---|---|
| 1. Enquiry | Floor plan or sketch, destination, intended use, target budget band | A quotation that lists inclusions and exclusions line by line |
| 2. Technical clarification | Wind, snow and seismic data or the site address; local code requirements | Structural design confirmed for the location |
| 3. Drawing approval | Comments consolidated by one named signatory | A signed, versioned shop drawing set |
| 4. Deposit | Payment against the proforma invoice | Production slot confirmed in writing |
| 5. Production | Answers to queries within the agreed window | First-article approval and in-line check records |
| 6. Inspection and packing | Inspection scope, plus a third-party inspector if you appoint one | Pre-shipment report and packing list |
| 7. Loading and documents | Booking details, consignee, customs broker | Bill of lading, commercial invoice, packing list, certificate of origin |
Stage three is the one buyers try to compress and the one that most often moves the delivery date. A drawing that goes back and forth between three reviewers with no single signatory can hold an order for weeks while the production slot moves to somebody else.
A quotation is only comparable to another quotation when both answer the same eight questions. Send them together and ask for a line-by-line reply.
Two things most buyers forget: ask for the container loading count per unit, and ask which certifications are in scope for this specific order rather than for the company in general. Both answers change the landed cost, and both are free to ask for.
We are an engineering-led supplier with a China supply base, and production runs at partner factories rather than at a plant we own. That sentence is worth stating plainly, because the alternative claim is common and rarely checkable. What it changes for a buyer is who holds the drawing and who signs the inspection report: both are ours, and both travel with the order.
It also changes what we will quote. We will not put a unit price on a page for a house that has not been drawn, because the frame gauge, wall build-up, glazing and fit-out level move the number more than any discount does. What we will do is price your drawing, itemise the inclusions, and put the loading count and the certification scope in the same document.
If you are still choosing a supplier rather than a product, the checks that matter are on the supplier verification page. If you have a plan and want a number against it, send the drawing through the Send Drawings route, or start from the light-steel villas and prefab houses range to see which build fits the project.
It sells a package, not a house. The package is a galvanized light-gauge steel frame cut to your drawing, wall and roof panels with insulation, doors and windows, and the electrical and plumbing rough-in, loaded into containers. Foundations, crane hire, on-site labour and anything the local building authority requires beyond the declared scope stay on your side of the contract. Anyone offering a finished house that arrives ready to occupy is describing a different product and a different price.
It depends on the panel schedule, so treat any single number with suspicion until someone has seen your floor plan. What can be stated without your drawing is the envelope: a 40 ft high-cube container gives about 12.03 m of internal length, 2.35 m of width and 2.69 m of height, roughly 28.3 m2 of floor and 76 m3 of volume, with a payload of about 26.5 tonnes. Panel bundles and frame sections are long and flat, so the constraint is usually how the bundle stacks rather than total weight. The loading count belongs in the quotation, per floor plan.
Send a drawing if you have one, and send a sketch of the site if you do not. A factory can develop the layout, but it has to design against a known wind load, snow load and seismic case for the destination, which is why the structural design is calculated per project location and confirmed on the quotation. The drawing that matters most is the one signed before production starts, not the one attached to the enquiry.
Minimum order and lead time are set per project, which is the honest answer for this category. A single cabin is possible; freight and the fixed setup cost are what make small orders expensive rather than the goods. Ask for the quotation to state the MOQ and the production slot in writing, because a verbal minimum is not a booking.
Ask by name rather than by the word certification. For the steel: a mill certificate to EN 10346 for the galvanized coil, and factory production control under EN 1090-1 with the execution class stated for the frame. For fire: a reaction-to-fire classification to EN 13501-1 for the assembly that was tested, not for one board. For corrosion: a coating system classified under EN ISO 12944 and galvanizing to ASTM A123 or EN ISO 1461. ISO 9001 covers the management system, not the product. The scope of what is certified is stated on our quotation, and test reports come with the documentation pack.
Lead time is quoted per project and counted from two events, not from the enquiry: the deposit, which books the production slot, and the signed drawing, which releases the unit into build. Ask for the five stages with a date against each one: drawing sign-off, production and in-line checks, packing and loading, freight, and on-site assembly. A supplier who gives a single duration without saying which event it counts from is quoting the middle of a sentence.
For a flat-pack villa, a small crew bolts the frame and closes the panels, and that crew can be local if it can follow the assembly drawings. For container-based units the work is lifting and connecting rather than building. What has to be settled before the container leaves is who does the foundation, who supplies the crane, and who signs off the electrical connection against the local code. Those three items are the usual source of a site delay, not the panels.
A full sample house is rarely economic because the freight costs more than the structure. The practical equivalent is a first-article approval: one panel type or one window unit built and photographed against the approved drawing before the run continues, plus a pre-shipment inspection on the actual production run. If a supplier cannot show you a first article, the first container is the sample, and you pay for it.
Container dimensions are the external figures in ISO 668 and the internal figures published for a 40 ft high cube; the mass limits are the container's maximum gross mass and tare, which give the payload by subtraction. Steel and coating references are EN 10346 (continuously hot-dip coated steel flat products), EN 1090-1 (execution of steel structures and factory production control), EN ISO 1461 and ASTM A123 (hot-dip galvanizing), EN ISO 12944 (corrosion protection of steel structures) and EN 13501-1 (reaction-to-fire classification). Product build-ups, tolerances and the loading count are the ones stated on our own product pages and confirmed per project on the quotation. Nothing on this page is a price offer for a specific house.